FREE FINANCIAL EDUCATION
Trading visual library
1,000 original synthetic scenarios across 100 clearly labeled trading and research concepts.
Calculated examples, with transparent counts
Explore 1,000 original scenario diagrams across 100 concepts. Each concept has ten explicit synthetic parameter sets. These are teaching illustrations, not 1,000 independent trading concepts or historical market charts. No random price curves or recolor-only variants are counted.
Download all scenario data and asset inventory (JSON) · Download all 1,000 SVGs (ZIP) · Open the new PDF cheat sheets · Campaign creative library
100 concepts available; ten scenarios each.
Risk and sizing
Risk budget in currency
A risk budget converts a chosen fraction of account equity into a planned currency loss. It is a planning constraint, not a guarantee that an exit will fill at that loss.
Formula: Budget = account equity x risk fraction
Download all ten SVGs for this concept
- Scenario 01 SVG — Equity 10,000; compare five risk fractions
- Scenario 02 SVG — Equity 25,000; compare five risk fractions
- Scenario 03 SVG — Equity 50,000; compare five risk fractions
- Scenario 04 SVG — Equity 75,000; compare five risk fractions
- Scenario 05 SVG — Equity 100,000; compare five risk fractions
- Scenario 06 SVG — Equity 150,000; compare five risk fractions
- Scenario 07 SVG — Equity 200,000; compare five risk fractions
- Scenario 08 SVG — Equity 300,000; compare five risk fractions
- Scenario 09 SVG — Equity 500,000; compare five risk fractions
- Scenario 10 SVG — Equity 1.00m; compare five risk fractions
Common mistake: Treating the planned budget as a guaranteed maximum loss ignores gaps and execution costs.
Risk and sizing
Sizing from stop distance
With a fixed currency budget, a wider entry-to-stop distance permits fewer units. The distance should reflect a defined invalidation rule before the quantity is calculated.
Formula: Units = floor(budget / stop distance)
Download all ten SVGs for this concept
- Scenario 01 SVG — Budget 250; stop distance changes quantity
- Scenario 02 SVG — Budget 400; stop distance changes quantity
- Scenario 03 SVG — Budget 500; stop distance changes quantity
- Scenario 04 SVG — Budget 750; stop distance changes quantity
- Scenario 05 SVG — Budget 1000; stop distance changes quantity
- Scenario 06 SVG — Budget 1250; stop distance changes quantity
- Scenario 07 SVG — Budget 1500; stop distance changes quantity
- Scenario 08 SVG — Budget 2000; stop distance changes quantity
- Scenario 09 SVG — Budget 3000; stop distance changes quantity
- Scenario 10 SVG — Budget 5000; stop distance changes quantity
Common mistake: Moving a stop closer merely to afford a larger position changes the trading hypothesis.
Risk and sizing
Sizing with a cost allowance
An estimated round-trip cost per unit consumes part of the loss budget. Including it in the denominator reduces quantity relative to a stop-only calculation.
Formula: Units = floor(budget / (distance + cost per unit))
Download all ten SVGs for this concept
- Scenario 01 SVG — Budget 250; stop 2; add per-unit costs
- Scenario 02 SVG — Budget 400; stop 3; add per-unit costs
- Scenario 03 SVG — Budget 500; stop 4; add per-unit costs
- Scenario 04 SVG — Budget 750; stop 5; add per-unit costs
- Scenario 05 SVG — Budget 1000; stop 6; add per-unit costs
- Scenario 06 SVG — Budget 1250; stop 7; add per-unit costs
- Scenario 07 SVG — Budget 1500; stop 8; add per-unit costs
- Scenario 08 SVG — Budget 2000; stop 9; add per-unit costs
- Scenario 09 SVG — Budget 3000; stop 10; add per-unit costs
- Scenario 10 SVG — Budget 5000; stop 11; add per-unit costs
Common mistake: Counting commission but omitting spread or adverse fills understates the budget used.
Risk and sizing
Lot rounding and unused budget
A valid quantity may need to be a whole number of lots. Rounding to the next smaller lot protects the intended budget but can leave part of it unused.
Formula: Lots = floor(budget / (lot size x loss per unit))
Download all ten SVGs for this concept
- Scenario 01 SVG — Budget 250; loss per unit 2
- Scenario 02 SVG — Budget 400; loss per unit 2.5
- Scenario 03 SVG — Budget 500; loss per unit 3
- Scenario 04 SVG — Budget 750; loss per unit 3.5
- Scenario 05 SVG — Budget 1000; loss per unit 4
- Scenario 06 SVG — Budget 1250; loss per unit 4.5
- Scenario 07 SVG — Budget 1500; loss per unit 5
- Scenario 08 SVG — Budget 2000; loss per unit 5.5
- Scenario 09 SVG — Budget 3000; loss per unit 6
- Scenario 10 SVG — Budget 5000; loss per unit 6.5
Common mistake: Rounding a fractional lot up can breach the planned loss budget.
Risk and sizing
Sizing with an exposure cap
A trade can satisfy a stop-risk rule and still commit too much notional capital. The final quantity is the smaller quantity allowed by risk and exposure constraints.
Formula: Units = min(risk-limited units, floor(notional cap / price))
Download all ten SVGs for this concept
- Scenario 01 SVG — Price 100; risk allows 50 units
- Scenario 02 SVG — Price 110; risk allows 80 units
- Scenario 03 SVG — Price 120; risk allows 100 units
- Scenario 04 SVG — Price 130; risk allows 150 units
- Scenario 05 SVG — Price 140; risk allows 200 units
- Scenario 06 SVG — Price 150; risk allows 250 units
- Scenario 07 SVG — Price 160; risk allows 300 units
- Scenario 08 SVG — Price 170; risk allows 400 units
- Scenario 09 SVG — Price 180; risk allows 600 units
- Scenario 10 SVG — Price 190; risk allows 1000 units
Common mistake: Assuming a small stop distance makes a highly concentrated position harmless.
Risk and sizing
Adding planned open risk
Portfolio heat is the sum of planned losses across open positions divided by account equity. This simple total does not capture co-movement or gap losses.
Formula: Heat = sum(planned position losses) / equity
Download all ten SVGs for this concept
- Scenario 01 SVG — Each position risks 250; equity 25000
- Scenario 02 SVG — Each position risks 400; equity 35000
- Scenario 03 SVG — Each position risks 500; equity 45000
- Scenario 04 SVG — Each position risks 750; equity 55000
- Scenario 05 SVG — Each position risks 1000; equity 65000
- Scenario 06 SVG — Each position risks 1250; equity 75000
- Scenario 07 SVG — Each position risks 1500; equity 85000
- Scenario 08 SVG — Each position risks 2000; equity 95000
- Scenario 09 SVG — Each position risks 3000; equity 105000
- Scenario 10 SVG — Each position risks 5000; equity 115000
Common mistake: Adding expected profits to offset open loss budgets hides the losses that may occur together.
Risk and sizing
Loss beyond a stop level
A stop instruction does not fix the eventual execution price. An opening gap or thin market can turn a planned stop loss into a larger realized loss.
Formula: Long loss = units x (entry - actual exit)
Download all ten SVGs for this concept
- Scenario 01 SVG — Long 10 units at 100; stop trigger 95
- Scenario 02 SVG — Long 15 units at 110; stop trigger 105
- Scenario 03 SVG — Long 20 units at 120; stop trigger 115
- Scenario 04 SVG — Long 25 units at 130; stop trigger 125
- Scenario 05 SVG — Long 30 units at 140; stop trigger 135
- Scenario 06 SVG — Long 35 units at 150; stop trigger 145
- Scenario 07 SVG — Long 40 units at 160; stop trigger 155
- Scenario 08 SVG — Long 45 units at 170; stop trigger 165
- Scenario 09 SVG — Long 50 units at 180; stop trigger 175
- Scenario 10 SVG — Long 55 units at 190; stop trigger 185
Common mistake: Using the stop trigger price as a guaranteed fill price understates adverse execution.
Risk and sizing
Notional leverage
Notional leverage compares gross exposure with account equity. For a linear position, a small percentage move in the underlying can produce a much larger percentage change in equity.
Formula: Leverage = gross notional / equity
Download all ten SVGs for this concept
- Scenario 01 SVG — Underlying adverse move 0.25%; linear exposure
- Scenario 02 SVG — Underlying adverse move 0.5%; linear exposure
- Scenario 03 SVG — Underlying adverse move 0.75%; linear exposure
- Scenario 04 SVG — Underlying adverse move 1%; linear exposure
- Scenario 05 SVG — Underlying adverse move 1.25%; linear exposure
- Scenario 06 SVG — Underlying adverse move 1.5%; linear exposure
- Scenario 07 SVG — Underlying adverse move 2%; linear exposure
- Scenario 08 SVG — Underlying adverse move 2.5%; linear exposure
- Scenario 09 SVG — Underlying adverse move 3%; linear exposure
- Scenario 10 SVG — Underlying adverse move 4%; linear exposure
Common mistake: Interpreting low margin as low economic exposure confuses collateral with position size.
Risk and sizing
Cash buffer after margin
The cash left after an assumed margin requirement provides a simple liquidity buffer. Margin requirements can change and an initial buffer is not a full loss forecast.
Formula: Buffer = cash equity - assumed margin
Download all ten SVGs for this concept
- Scenario 01 SVG — Cash equity 10000; vary assumed margin use
- Scenario 02 SVG — Cash equity 15000; vary assumed margin use
- Scenario 03 SVG — Cash equity 20000; vary assumed margin use
- Scenario 04 SVG — Cash equity 25000; vary assumed margin use
- Scenario 05 SVG — Cash equity 30000; vary assumed margin use
- Scenario 06 SVG — Cash equity 35000; vary assumed margin use
- Scenario 07 SVG — Cash equity 40000; vary assumed margin use
- Scenario 08 SVG — Cash equity 45000; vary assumed margin use
- Scenario 09 SVG — Cash equity 50000; vary assumed margin use
- Scenario 10 SVG — Cash equity 55000; vary assumed margin use
Common mistake: Deploying every available unit of cash leaves no room for variation margin, fees or changing requirements.
Risk and sizing
Remaining daily loss budget
A daily loss limit can be translated into remaining room after closed losses and planned open risk. The exercise exposes a breach before a new position adds risk.
Formula: Remaining = daily limit - closed losses - open planned risk
Download all ten SVGs for this concept
- Scenario 01 SVG — Daily limit 1000; open planned risk 100
- Scenario 02 SVG — Daily limit 1250; open planned risk 150
- Scenario 03 SVG — Daily limit 1500; open planned risk 200
- Scenario 04 SVG — Daily limit 1750; open planned risk 250
- Scenario 05 SVG — Daily limit 2000; open planned risk 300
- Scenario 06 SVG — Daily limit 2250; open planned risk 350
- Scenario 07 SVG — Daily limit 2500; open planned risk 400
- Scenario 08 SVG — Daily limit 2750; open planned risk 450
- Scenario 09 SVG — Daily limit 3000; open planned risk 500
- Scenario 10 SVG — Daily limit 3250; open planned risk 550
Common mistake: Resetting the loss tally after a winning trade can conceal a rule breach if the policy uses gross losses.
Performance arithmetic
Reward relative to planned risk
A target-to-stop ratio compares potential favorable movement with planned adverse movement. It describes an intended price geometry and says nothing about the probability of either exit.
Formula: Reward/risk = target distance / stop distance
Download all ten SVGs for this concept
- Scenario 01 SVG — Fixed planned stop distance 2
- Scenario 02 SVG — Fixed planned stop distance 3
- Scenario 03 SVG — Fixed planned stop distance 4
- Scenario 04 SVG — Fixed planned stop distance 5
- Scenario 05 SVG — Fixed planned stop distance 6
- Scenario 06 SVG — Fixed planned stop distance 7
- Scenario 07 SVG — Fixed planned stop distance 8
- Scenario 08 SVG — Fixed planned stop distance 9
- Scenario 09 SVG — Fixed planned stop distance 10
- Scenario 10 SVG — Fixed planned stop distance 11
Common mistake: Calling a large target-to-stop ratio a profitable strategy without measuring outcomes omits probability.
Performance arithmetic
Break-even win probability
For a simplified two-outcome trade with fixed win and loss sizes, the break-even win probability balances expected gains and losses. Real outcome distributions may contain many sizes.
Formula: Break-even probability = loss / (win + loss)
Download all ten SVGs for this concept
- Scenario 01 SVG — Fixed loss 50; win is a multiple of loss
- Scenario 02 SVG — Fixed loss 75; win is a multiple of loss
- Scenario 03 SVG — Fixed loss 100; win is a multiple of loss
- Scenario 04 SVG — Fixed loss 125; win is a multiple of loss
- Scenario 05 SVG — Fixed loss 150; win is a multiple of loss
- Scenario 06 SVG — Fixed loss 175; win is a multiple of loss
- Scenario 07 SVG — Fixed loss 200; win is a multiple of loss
- Scenario 08 SVG — Fixed loss 225; win is a multiple of loss
- Scenario 09 SVG — Fixed loss 250; win is a multiple of loss
- Scenario 10 SVG — Fixed loss 275; win is a multiple of loss
Common mistake: Applying the formula to a variable-payoff strategy without using representative outcome sizes can mislead.
Performance arithmetic
Expected value per trade
Expected value weights each possible payoff by its probability. Positive arithmetic expectation in an assumed model is not evidence that its probabilities or payoffs are stable in future data.
Formula: EV = p x average win - (1 - p) x average loss
Download all ten SVGs for this concept
- Scenario 01 SVG — Average win 100; average loss 75
- Scenario 02 SVG — Average win 125; average loss 85
- Scenario 03 SVG — Average win 150; average loss 95
- Scenario 04 SVG — Average win 175; average loss 105
- Scenario 05 SVG — Average win 200; average loss 115
- Scenario 06 SVG — Average win 225; average loss 125
- Scenario 07 SVG — Average win 250; average loss 135
- Scenario 08 SVG — Average win 275; average loss 145
- Scenario 09 SVG — Average win 300; average loss 155
- Scenario 10 SVG — Average win 325; average loss 165
Common mistake: Confusing a positive average with a promise of profit ignores estimation error and losing sequences.
Performance arithmetic
Normalizing results in R
An R-multiple expresses a trade result as a multiple of its original planned currency risk. Keeping the original denominator allows trades of different quantities to be compared.
Formula: R = net trade result / original planned risk
Download all ten SVGs for this concept
- Scenario 01 SVG — Original planned risk 100; compare cash results
- Scenario 02 SVG — Original planned risk 150; compare cash results
- Scenario 03 SVG — Original planned risk 200; compare cash results
- Scenario 04 SVG — Original planned risk 250; compare cash results
- Scenario 05 SVG — Original planned risk 300; compare cash results
- Scenario 06 SVG — Original planned risk 350; compare cash results
- Scenario 07 SVG — Original planned risk 400; compare cash results
- Scenario 08 SVG — Original planned risk 450; compare cash results
- Scenario 09 SVG — Original planned risk 500; compare cash results
- Scenario 10 SVG — Original planned risk 550; compare cash results
Common mistake: Changing the denominator after the trade improves the reported R without changing the actual outcome.
Performance arithmetic
Profit factor from trade groups
Profit factor divides the sum of positive trade results by the absolute sum of negative results. It needs losing observations and can be unstable in a short sample.
Formula: Profit factor = gross profits / absolute gross losses
Download all ten SVGs for this concept
- Scenario 01 SVG — Absolute gross losses 200
- Scenario 02 SVG — Absolute gross losses 300
- Scenario 03 SVG — Absolute gross losses 400
- Scenario 04 SVG — Absolute gross losses 500
- Scenario 05 SVG — Absolute gross losses 600
- Scenario 06 SVG — Absolute gross losses 700
- Scenario 07 SVG — Absolute gross losses 800
- Scenario 08 SVG — Absolute gross losses 900
- Scenario 09 SVG — Absolute gross losses 1000
- Scenario 10 SVG — Absolute gross losses 1100
Common mistake: Reporting a finite ratio when there are no losses invents information that the denominator does not contain.
Performance arithmetic
Costs and net expectancy
Subtracting expected all-in trading costs from gross expected payoff shows how a small apparent edge may disappear. A constant cost assumption is a simplification of variable execution conditions.
Formula: Net EV = gross EV - average all-in cost
Download all ten SVGs for this concept
- Scenario 01 SVG — Assumed gross expected payoff 5 per trade
- Scenario 02 SVG — Assumed gross expected payoff 7 per trade
- Scenario 03 SVG — Assumed gross expected payoff 9 per trade
- Scenario 04 SVG — Assumed gross expected payoff 11 per trade
- Scenario 05 SVG — Assumed gross expected payoff 13 per trade
- Scenario 06 SVG — Assumed gross expected payoff 15 per trade
- Scenario 07 SVG — Assumed gross expected payoff 17 per trade
- Scenario 08 SVG — Assumed gross expected payoff 19 per trade
- Scenario 09 SVG — Assumed gross expected payoff 21 per trade
- Scenario 10 SVG — Assumed gross expected payoff 23 per trade
Common mistake: Using headline commission alone can miss spread, slippage and other applicable charges.
Performance arithmetic
Fixed-fraction losing streaks
Repeated equal fractional losses reduce the remaining equity geometrically. The currency amount lost declines if the fraction is recalculated on the smaller balance after every trade.
Formula: Equity after n losses = initial equity x (1 - loss fraction)^n
Download all ten SVGs for this concept
- Scenario 01 SVG — Each loss is 0.25% of remaining equity
- Scenario 02 SVG — Each loss is 0.5% of remaining equity
- Scenario 03 SVG — Each loss is 0.75% of remaining equity
- Scenario 04 SVG — Each loss is 1% of remaining equity
- Scenario 05 SVG — Each loss is 1.5% of remaining equity
- Scenario 06 SVG — Each loss is 2% of remaining equity
- Scenario 07 SVG — Each loss is 3% of remaining equity
- Scenario 08 SVG — Each loss is 4% of remaining equity
- Scenario 09 SVG — Each loss is 5% of remaining equity
- Scenario 10 SVG — Each loss is 10% of remaining equity
Common mistake: Multiplying a fractional loss by the number of trades ignores the changing equity base.
Performance arithmetic
Gain required after a drawdown
A drawdown reduces the base on which a recovery gain is earned. The percentage gain needed to recover therefore exceeds the percentage loss whenever the loss is positive.
Formula: Recovery fraction = drawdown / (1 - drawdown)
Download all ten SVGs for this concept
- Scenario 01 SVG — Starting capital 10000; changing recovery base
- Scenario 02 SVG — Starting capital 20000; changing recovery base
- Scenario 03 SVG — Starting capital 30000; changing recovery base
- Scenario 04 SVG — Starting capital 40000; changing recovery base
- Scenario 05 SVG — Starting capital 50000; changing recovery base
- Scenario 06 SVG — Starting capital 60000; changing recovery base
- Scenario 07 SVG — Starting capital 70000; changing recovery base
- Scenario 08 SVG — Starting capital 80000; changing recovery base
- Scenario 09 SVG — Starting capital 90000; changing recovery base
- Scenario 10 SVG — Starting capital 100000; changing recovery base
Common mistake: Assuming a 20 percent gain reverses a 20 percent loss uses different percentage bases.
Performance arithmetic
Arithmetic and geometric returns
The arithmetic mean averages period returns, while compounded wealth multiplies their growth factors. Volatility can leave compounded wealth lower even when the arithmetic average is unchanged.
Formula: Geometric mean = product(1 + r)^(1/n) - 1
Download all ten SVGs for this concept
- Scenario 01 SVG — Two-period arithmetic mean fixed at 1%
- Scenario 02 SVG — Two-period arithmetic mean fixed at 1.5%
- Scenario 03 SVG — Two-period arithmetic mean fixed at 2%
- Scenario 04 SVG — Two-period arithmetic mean fixed at 2.5%
- Scenario 05 SVG — Two-period arithmetic mean fixed at 3%
- Scenario 06 SVG — Two-period arithmetic mean fixed at 3.5%
- Scenario 07 SVG — Two-period arithmetic mean fixed at 4%
- Scenario 08 SVG — Two-period arithmetic mean fixed at 4.5%
- Scenario 09 SVG — Two-period arithmetic mean fixed at 5%
- Scenario 10 SVG — Two-period arithmetic mean fixed at 5.5%
Common mistake: Adding returns across periods treats sequential percentage changes as if they had a constant base.
Performance arithmetic
Compounding equal period returns
A constant hypothetical return reinvested each period creates compound growth or decay. The smooth path is an arithmetic illustration rather than a plausible promise about market returns.
Formula: Ending wealth = starting wealth x (1 + r)^n
Download all ten SVGs for this concept
- Scenario 01 SVG — Constant hypothetical period return -5%
- Scenario 02 SVG — Constant hypothetical period return -2%
- Scenario 03 SVG — Constant hypothetical period return -1%
- Scenario 04 SVG — Constant hypothetical period return 0%
- Scenario 05 SVG — Constant hypothetical period return 1%
- Scenario 06 SVG — Constant hypothetical period return 2%
- Scenario 07 SVG — Constant hypothetical period return 3%
- Scenario 08 SVG — Constant hypothetical period return 5%
- Scenario 09 SVG — Constant hypothetical period return 7%
- Scenario 10 SVG — Constant hypothetical period return 10%
Common mistake: Presenting a constant-return curve as a forecast suppresses volatility and uncertainty.
Execution arithmetic
Return on committed capital
Return on capital compares a net currency result with a stated capital base. Different denominators such as cash paid, margin posted and gross notional answer different questions.
Formula: Return = net result / stated capital base
Download all ten SVGs for this concept
- Scenario 01 SVG — Net result 100; the denominator changes the ratio
- Scenario 02 SVG — Net result 150; the denominator changes the ratio
- Scenario 03 SVG — Net result 200; the denominator changes the ratio
- Scenario 04 SVG — Net result 250; the denominator changes the ratio
- Scenario 05 SVG — Net result 300; the denominator changes the ratio
- Scenario 06 SVG — Net result 350; the denominator changes the ratio
- Scenario 07 SVG — Net result 400; the denominator changes the ratio
- Scenario 08 SVG — Net result 450; the denominator changes the ratio
- Scenario 09 SVG — Net result 500; the denominator changes the ratio
- Scenario 10 SVG — Net result 550; the denominator changes the ratio
Common mistake: Switching from notional to margin after seeing the result makes comparisons inconsistent.
Execution arithmetic
Long-position profit and loss
For a linear long position, price appreciation creates gross profit and price depreciation creates gross loss. Quantity multiplies the effect; trading costs reduce the final result.
Formula: Net P/L = units x (exit - entry) - costs
Download all ten SVGs for this concept
- Scenario 01 SVG — Long 10 units at 100; costs 5
- Scenario 02 SVG — Long 15 units at 110; costs 6
- Scenario 03 SVG — Long 20 units at 120; costs 7
- Scenario 04 SVG — Long 25 units at 130; costs 8
- Scenario 05 SVG — Long 30 units at 140; costs 9
- Scenario 06 SVG — Long 35 units at 150; costs 10
- Scenario 07 SVG — Long 40 units at 160; costs 11
- Scenario 08 SVG — Long 45 units at 170; costs 12
- Scenario 09 SVG — Long 50 units at 180; costs 13
- Scenario 10 SVG — Long 55 units at 190; costs 14
Common mistake: Subtracting costs from profitable trades but omitting them from losses biases a journal.
Execution arithmetic
Short-position profit and loss
A linear short position benefits when the exit price is below the entry price. Rising prices create losses; borrowing charges and other costs can add to that loss.
Formula: Net P/L = units x (entry - exit) - costs
Download all ten SVGs for this concept
- Scenario 01 SVG — Short 10 units at 100; costs 5
- Scenario 02 SVG — Short 15 units at 110; costs 6
- Scenario 03 SVG — Short 20 units at 120; costs 7
- Scenario 04 SVG — Short 25 units at 130; costs 8
- Scenario 05 SVG — Short 30 units at 140; costs 9
- Scenario 06 SVG — Short 35 units at 150; costs 10
- Scenario 07 SVG — Short 40 units at 160; costs 11
- Scenario 08 SVG — Short 45 units at 170; costs 12
- Scenario 09 SVG — Short 50 units at 180; costs 13
- Scenario 10 SVG — Short 55 units at 190; costs 14
Common mistake: Copying a long-position sign convention reverses the result of a short trade.
Execution arithmetic
Weighted average entry price
Average entry price must weight each fill by its quantity. A simple average of fill prices is correct only when the quantities are equal.
Formula: Average entry = sum(price x quantity) / sum(quantity)
Download all ten SVGs for this concept
- Scenario 01 SVG — First fill: 50 at 100; second fill at 110
- Scenario 02 SVG — First fill: 50 at 110; second fill at 120
- Scenario 03 SVG — First fill: 50 at 120; second fill at 130
- Scenario 04 SVG — First fill: 50 at 130; second fill at 140
- Scenario 05 SVG — First fill: 50 at 140; second fill at 150
- Scenario 06 SVG — First fill: 50 at 150; second fill at 160
- Scenario 07 SVG — First fill: 50 at 160; second fill at 170
- Scenario 08 SVG — First fill: 50 at 170; second fill at 180
- Scenario 09 SVG — First fill: 50 at 180; second fill at 190
- Scenario 10 SVG — First fill: 50 at 190; second fill at 200
Common mistake: Averaging two prices without their fill quantities can materially misstate the cost basis.
Execution arithmetic
Realized results from partial exits
A partial exit realizes profit or loss only on the quantity closed. The remaining quantity remains exposed, and the final combined result depends on every fill.
Formula: Total gross P/L = sum(exit quantity x (exit price - entry))
Download all ten SVGs for this concept
- Scenario 01 SVG — 100 units: first exit +10; remainder -5 per unit
- Scenario 02 SVG — 100 units: first exit +10; remainder -6 per unit
- Scenario 03 SVG — 100 units: first exit +10; remainder -7 per unit
- Scenario 04 SVG — 100 units: first exit +10; remainder -8 per unit
- Scenario 05 SVG — 100 units: first exit +10; remainder -9 per unit
- Scenario 06 SVG — 100 units: first exit +10; remainder -10 per unit
- Scenario 07 SVG — 100 units: first exit +10; remainder -11 per unit
- Scenario 08 SVG — 100 units: first exit +10; remainder -12 per unit
- Scenario 09 SVG — 100 units: first exit +10; remainder -13 per unit
- Scenario 10 SVG — 100 units: first exit +10; remainder -14 per unit
Common mistake: Counting an unrealized gain on the remaining position as a completed result mixes two states.
Execution arithmetic
Round-trip cost budget
A trading-cost estimate aggregates the expenses of entry and exit. A per-unit estimate scales with quantity, while a fixed ticket charge does not scale in the same way.
Formula: Total cost = fixed charges + units x variable cost per unit
Download all ten SVGs for this concept
- Scenario 01 SVG — Fixed charges 5; variable round-trip 0.1 per unit
- Scenario 02 SVG — Fixed charges 6; variable round-trip 0.15 per unit
- Scenario 03 SVG — Fixed charges 7; variable round-trip 0.2 per unit
- Scenario 04 SVG — Fixed charges 8; variable round-trip 0.25 per unit
- Scenario 05 SVG — Fixed charges 9; variable round-trip 0.3 per unit
- Scenario 06 SVG — Fixed charges 10; variable round-trip 0.35 per unit
- Scenario 07 SVG — Fixed charges 11; variable round-trip 0.4 per unit
- Scenario 08 SVG — Fixed charges 12; variable round-trip 0.45 per unit
- Scenario 09 SVG — Fixed charges 13; variable round-trip 0.5 per unit
- Scenario 10 SVG — Fixed charges 14; variable round-trip 0.55 per unit
Common mistake: Doubling a quoted round-trip rate counts both sides twice if they were already included.
Execution arithmetic
Quoted bid-ask spread
The quoted spread is the distance between the best ask and best bid. Expressing it in basis points of the midpoint makes proportional spreads easier to compare across prices.
Formula: Spread bps = (ask - bid) / midpoint x 10,000
Download all ten SVGs for this concept
- Scenario 01 SVG — Quote midpoint 100; compare proportional spreads
- Scenario 02 SVG — Quote midpoint 110; compare proportional spreads
- Scenario 03 SVG — Quote midpoint 120; compare proportional spreads
- Scenario 04 SVG — Quote midpoint 130; compare proportional spreads
- Scenario 05 SVG — Quote midpoint 140; compare proportional spreads
- Scenario 06 SVG — Quote midpoint 150; compare proportional spreads
- Scenario 07 SVG — Quote midpoint 160; compare proportional spreads
- Scenario 08 SVG — Quote midpoint 170; compare proportional spreads
- Scenario 09 SVG — Quote midpoint 180; compare proportional spreads
- Scenario 10 SVG — Quote midpoint 190; compare proportional spreads
Common mistake: Comparing raw currency spreads across very different prices can reverse the apparent cost ranking.
Execution arithmetic
Adverse slippage per fill
Slippage measures the difference between a benchmark price and the actual fill. Direction matters: a higher buy fill or lower sell fill is adverse under this convention.
Formula: Adverse buy slippage = fill price - benchmark price
Download all ten SVGs for this concept
- Scenario 01 SVG — Buy 50 units; negative means price improvement
- Scenario 02 SVG — Buy 75 units; negative means price improvement
- Scenario 03 SVG — Buy 100 units; negative means price improvement
- Scenario 04 SVG — Buy 125 units; negative means price improvement
- Scenario 05 SVG — Buy 150 units; negative means price improvement
- Scenario 06 SVG — Buy 175 units; negative means price improvement
- Scenario 07 SVG — Buy 200 units; negative means price improvement
- Scenario 08 SVG — Buy 225 units; negative means price improvement
- Scenario 09 SVG — Buy 250 units; negative means price improvement
- Scenario 10 SVG — Buy 275 units; negative means price improvement
Common mistake: Comparing fills with a later favorable quote creates a benchmark that was unavailable at the decision time.
Execution arithmetic
Implementation shortfall on filled units
For the filled portion of a buy order, implementation shortfall compares the actual execution cost with buying those same units at the decision price, then adds explicit charges.
Formula: Shortfall = units x (fill - decision price) + charges
Download all ten SVGs for this concept
- Scenario 01 SVG — Filled buy: 50 units; explicit charges 5
- Scenario 02 SVG — Filled buy: 75 units; explicit charges 6
- Scenario 03 SVG — Filled buy: 100 units; explicit charges 7
- Scenario 04 SVG — Filled buy: 125 units; explicit charges 8
- Scenario 05 SVG — Filled buy: 150 units; explicit charges 9
- Scenario 06 SVG — Filled buy: 175 units; explicit charges 10
- Scenario 07 SVG — Filled buy: 200 units; explicit charges 11
- Scenario 08 SVG — Filled buy: 225 units; explicit charges 12
- Scenario 09 SVG — Filled buy: 250 units; explicit charges 13
- Scenario 10 SVG — Filled buy: 275 units; explicit charges 14
Common mistake: Ignoring unfilled opportunity cost is acceptable only if the metric is clearly restricted to filled units.
Execution arithmetic
Turnover and proportional costs
If each full portfolio turnover incurs a constant proportional cost, more turnover increases the cost drag. This arithmetic estimate excludes price impact and nonlinear liquidity effects.
Formula: Approximate drag = turnover multiple x cost per turnover
Download all ten SVGs for this concept
- Scenario 01 SVG — Each complete turnover costs 1 basis points
- Scenario 02 SVG — Each complete turnover costs 2 basis points
- Scenario 03 SVG — Each complete turnover costs 3 basis points
- Scenario 04 SVG — Each complete turnover costs 5 basis points
- Scenario 05 SVG — Each complete turnover costs 7 basis points
- Scenario 06 SVG — Each complete turnover costs 10 basis points
- Scenario 07 SVG — Each complete turnover costs 15 basis points
- Scenario 08 SVG — Each complete turnover costs 20 basis points
- Scenario 09 SVG — Each complete turnover costs 30 basis points
- Scenario 10 SVG — Each complete turnover costs 50 basis points
Common mistake: Treating a low per-trade charge as negligible ignores how frequently it is paid.
Derivatives mechanics
Value of one futures tick
A futures tick value converts the contract's minimum quoted price movement into currency using the contract multiplier. Product specifications determine both inputs.
Formula: Tick value = tick size x contract multiplier
Download all ten SVGs for this concept
- Scenario 01 SVG — Hypothetical contract multiplier 1
- Scenario 02 SVG — Hypothetical contract multiplier 5
- Scenario 03 SVG — Hypothetical contract multiplier 10
- Scenario 04 SVG — Hypothetical contract multiplier 20
- Scenario 05 SVG — Hypothetical contract multiplier 25
- Scenario 06 SVG — Hypothetical contract multiplier 50
- Scenario 07 SVG — Hypothetical contract multiplier 75
- Scenario 08 SVG — Hypothetical contract multiplier 100
- Scenario 09 SVG — Hypothetical contract multiplier 250
- Scenario 10 SVG — Hypothetical contract multiplier 1000
Common mistake: Assuming identical tick values across futures products ignores their different multipliers.
Derivatives mechanics
Futures profit in ticks
A futures price move can be expressed as a number of ticks, then multiplied by currency per tick and the number of contracts. The sign follows the position direction.
Formula: P/L = signed ticks x tick value x contracts
Download all ten SVGs for this concept
- Scenario 01 SVG — 1 long contracts; tick value 1
- Scenario 02 SVG — 2 long contracts; tick value 2
- Scenario 03 SVG — 3 long contracts; tick value 3
- Scenario 04 SVG — 1 long contracts; tick value 4
- Scenario 05 SVG — 2 long contracts; tick value 5
- Scenario 06 SVG — 3 long contracts; tick value 6
- Scenario 07 SVG — 1 long contracts; tick value 7
- Scenario 08 SVG — 2 long contracts; tick value 8
- Scenario 09 SVG — 3 long contracts; tick value 9
- Scenario 10 SVG — 1 long contracts; tick value 10
Common mistake: Calculating price-point profit without the contract multiplier understates exposure.
Derivatives mechanics
Futures notional exposure
Notional exposure represents the quoted price times the contract multiplier and quantity. It differs from the margin collateral required to maintain the position.
Formula: Notional = quoted price x multiplier x contracts
Download all ten SVGs for this concept
- Scenario 01 SVG — Quote 100; multiplier 10; synthetic contract
- Scenario 02 SVG — Quote 150; multiplier 15; synthetic contract
- Scenario 03 SVG — Quote 200; multiplier 20; synthetic contract
- Scenario 04 SVG — Quote 250; multiplier 25; synthetic contract
- Scenario 05 SVG — Quote 300; multiplier 30; synthetic contract
- Scenario 06 SVG — Quote 350; multiplier 35; synthetic contract
- Scenario 07 SVG — Quote 400; multiplier 40; synthetic contract
- Scenario 08 SVG — Quote 450; multiplier 45; synthetic contract
- Scenario 09 SVG — Quote 500; multiplier 50; synthetic contract
- Scenario 10 SVG — Quote 550; multiplier 55; synthetic contract
Common mistake: Reporting the margin deposit as the full economic exposure obscures the effect of price changes.
Derivatives mechanics
Futures basis convention
Basis compares the futures and cash prices under an explicitly chosen sign convention. Here it is futures minus spot; another text may use the reverse convention.
Formula: Basis = futures price - spot price
Download all ten SVGs for this concept
- Scenario 01 SVG — Spot 100; convention is futures minus spot
- Scenario 02 SVG — Spot 110; convention is futures minus spot
- Scenario 03 SVG — Spot 120; convention is futures minus spot
- Scenario 04 SVG — Spot 130; convention is futures minus spot
- Scenario 05 SVG — Spot 140; convention is futures minus spot
- Scenario 06 SVG — Spot 150; convention is futures minus spot
- Scenario 07 SVG — Spot 160; convention is futures minus spot
- Scenario 08 SVG — Spot 170; convention is futures minus spot
- Scenario 09 SVG — Spot 180; convention is futures minus spot
- Scenario 10 SVG — Spot 190; convention is futures minus spot
Common mistake: Comparing basis values from opposite sign conventions produces a false disagreement.
Derivatives mechanics
Simple futures hedge quantity
A simple equal-exposure hedge divides the currency exposure to offset by the notional of one futures contract. Integer contracts introduce under-hedging or over-hedging.
Formula: Contracts = exposure / contract notional
Download all ten SVGs for this concept
- Scenario 01 SVG — One hedge contract notional 5000
- Scenario 02 SVG — One hedge contract notional 7500
- Scenario 03 SVG — One hedge contract notional 10000
- Scenario 04 SVG — One hedge contract notional 12500
- Scenario 05 SVG — One hedge contract notional 15000
- Scenario 06 SVG — One hedge contract notional 17500
- Scenario 07 SVG — One hedge contract notional 20000
- Scenario 08 SVG — One hedge contract notional 22500
- Scenario 09 SVG — One hedge contract notional 25000
- Scenario 10 SVG — One hedge contract notional 27500
Common mistake: Treating an equal-notional hedge as perfect ignores basis, timing and underlying mismatch.
Derivatives mechanics
Daily futures settlement arithmetic
Daily settlement changes the cash value of a futures position according to the move from the prior settlement. A sequence of gains and losses can create funding needs before the final outcome.
Formula: Daily variation = price change x multiplier x contracts
Download all ten SVGs for this concept
- Scenario 01 SVG — One long contract; multiplier 10
- Scenario 02 SVG — One long contract; multiplier 15
- Scenario 03 SVG — One long contract; multiplier 20
- Scenario 04 SVG — One long contract; multiplier 25
- Scenario 05 SVG — One long contract; multiplier 30
- Scenario 06 SVG — One long contract; multiplier 35
- Scenario 07 SVG — One long contract; multiplier 40
- Scenario 08 SVG — One long contract; multiplier 45
- Scenario 09 SVG — One long contract; multiplier 50
- Scenario 10 SVG — One long contract; multiplier 55
Common mistake: Looking only at the total end-to-end result hides an interim cash requirement.
Derivatives mechanics
Futures calendar-spread value
An equal-multiplier long-near and short-far spread gains when the near-minus-far price difference increases. Each leg still has execution and margin characteristics.
Formula: Spread P/L = change in (near - far) x multiplier
Download all ten SVGs for this concept
- Scenario 01 SVG — Long near / short far; initial spread -5; multiplier 10
- Scenario 02 SVG — Long near / short far; initial spread -5; multiplier 20
- Scenario 03 SVG — Long near / short far; initial spread -5; multiplier 30
- Scenario 04 SVG — Long near / short far; initial spread -5; multiplier 40
- Scenario 05 SVG — Long near / short far; initial spread -5; multiplier 50
- Scenario 06 SVG — Long near / short far; initial spread -5; multiplier 60
- Scenario 07 SVG — Long near / short far; initial spread -5; multiplier 70
- Scenario 08 SVG — Long near / short far; initial spread -5; multiplier 80
- Scenario 09 SVG — Long near / short far; initial spread -5; multiplier 90
- Scenario 10 SVG — Long near / short far; initial spread -5; multiplier 100
Common mistake: Treating two legs as risk-free because their gross notionals offset ignores spread and legging risk.
Derivatives mechanics
Margin utilization ratio
Margin utilization measures the share of available account equity consumed by an assumed margin requirement. It is a liquidity indicator, not a complete measure of portfolio risk.
Formula: Utilization = required margin / equity
Download all ten SVGs for this concept
- Scenario 01 SVG — Available equity 10000; test margin requirements
- Scenario 02 SVG — Available equity 15000; test margin requirements
- Scenario 03 SVG — Available equity 20000; test margin requirements
- Scenario 04 SVG — Available equity 25000; test margin requirements
- Scenario 05 SVG — Available equity 30000; test margin requirements
- Scenario 06 SVG — Available equity 35000; test margin requirements
- Scenario 07 SVG — Available equity 40000; test margin requirements
- Scenario 08 SVG — Available equity 45000; test margin requirements
- Scenario 09 SVG — Available equity 50000; test margin requirements
- Scenario 10 SVG — Available equity 55000; test margin requirements
Common mistake: A low utilization ratio cannot prove that a position has a low maximum loss.
Option arithmetic
Call intrinsic value at expiry
At expiry, a call's intrinsic value is the positive part of the underlying price minus its strike. This value excludes the premium paid, so it is not the option buyer's profit.
Formula: Call intrinsic = max(underlying - strike, 0)
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Calling intrinsic value profit omits the purchase premium and contract multiplier.
Option arithmetic
Put intrinsic value at expiry
At expiry, a put's intrinsic value is the positive part of the strike minus the underlying price. It reaches zero when the underlying is at or above the strike.
Formula: Put intrinsic = max(strike - underlying, 0)
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Using call-style subtraction reverses which prices create intrinsic value for a put.
Option arithmetic
Call premium beyond intrinsic value
For a quoted call, extrinsic or time value is the premium remaining after intrinsic value is subtracted. The quote may also reflect exercise style, market frictions and data quality.
Formula: Extrinsic value = call premium - max(spot - strike, 0)
Download all ten SVGs for this concept
- Scenario 01 SVG — Spot 102; strike 100; intrinsic 2
- Scenario 02 SVG — Spot 113; strike 110; intrinsic 3
- Scenario 03 SVG — Spot 124; strike 120; intrinsic 4
- Scenario 04 SVG — Spot 135; strike 130; intrinsic 5
- Scenario 05 SVG — Spot 146; strike 140; intrinsic 6
- Scenario 06 SVG — Spot 157; strike 150; intrinsic 7
- Scenario 07 SVG — Spot 168; strike 160; intrinsic 8
- Scenario 08 SVG — Spot 179; strike 170; intrinsic 9
- Scenario 09 SVG — Spot 190; strike 180; intrinsic 10
- Scenario 10 SVG — Spot 201; strike 190; intrinsic 11
Common mistake: Interpreting a stale or crossed quote as meaningful negative time value ignores data consistency.
Option arithmetic
Put premium beyond intrinsic value
A put's extrinsic value is its premium less the positive part of strike minus spot. This decomposition describes the quote and does not explain every driver of its price.
Formula: Extrinsic value = put premium - max(strike - spot, 0)
Download all ten SVGs for this concept
- Scenario 01 SVG — Spot 98; strike 100; intrinsic 2
- Scenario 02 SVG — Spot 107; strike 110; intrinsic 3
- Scenario 03 SVG — Spot 116; strike 120; intrinsic 4
- Scenario 04 SVG — Spot 125; strike 130; intrinsic 5
- Scenario 05 SVG — Spot 134; strike 140; intrinsic 6
- Scenario 06 SVG — Spot 143; strike 150; intrinsic 7
- Scenario 07 SVG — Spot 152; strike 160; intrinsic 8
- Scenario 08 SVG — Spot 161; strike 170; intrinsic 9
- Scenario 09 SVG — Spot 170; strike 180; intrinsic 10
- Scenario 10 SVG — Spot 179; strike 190; intrinsic 11
Common mistake: Comparing total premiums across strikes without separating intrinsic value can confuse moneyness with expensive volatility.
Option arithmetic
Long-call expiry break-even
A long call breaks even at expiry when its intrinsic value equals the premium paid. Before expiry, its market value also reflects volatility and time remaining.
Formula: Expiry break-even = strike + premium paid
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Using the expiry break-even as a forecast or a pre-expiry mark-to-market rule misstates its purpose.
Option arithmetic
Long-put expiry break-even
A long put breaks even at expiry when the strike-minus-underlying payoff equals the premium paid. A positive option payoff can still be smaller than its initial cost.
Formula: Expiry break-even = strike - premium paid
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Assuming any move below the strike is a profitable put trade ignores the premium.
Option arithmetic
Debit spread maximum payoff
A same-expiry call debit spread buys a lower strike and sells a higher strike. At expiry its intrinsic spread value is bounded by the strike width; subtracting the debit gives P/L.
Formula: Maximum profit = strike width - net debit
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Confusing the gross strike width with net profit ignores the debit paid.
Option arithmetic
Credit spread maximum loss
For an equal-quantity same-expiry credit spread, the adverse intrinsic difference is bounded by the strike width. Subtracting the initial credit gives the idealized expiry maximum loss.
Formula: Maximum loss = strike width - net credit
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Treating the received credit as the amount at risk reverses the relevant calculation.
Option arithmetic
Covered-call expiry cap
Holding one underlying unit and selling one call against it caps the combined expiry proceeds above the strike. The premium cushions only part of a decline in the underlying.
Formula: P/L = min(expiry price, strike) - stock entry + premium
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Calling the premium protection against all downside ignores the remaining stock loss.
Option arithmetic
Protective-put expiry floor
Holding an underlying unit and a matching long put creates an idealized expiry value floor at the put strike. The floor's net result also depends on stock entry and put premium.
Formula: P/L = max(expiry price, strike) - stock entry - put premium
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Ignoring the put premium overstates the protection's net floor.
Option arithmetic
Long-straddle expiry thresholds
A long straddle buys a call and put at the same strike and expiry. The combined premium creates two expiry break-even prices; a move alone may be too small to recover that premium.
Formula: Break-evens = strike minus or plus total premium
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Expecting every volatile day to produce a profitable expiry straddle ignores the size and price of the move.
Option arithmetic
Symmetric call-butterfly payoff
A long symmetric call butterfly buys one low-strike call, sells two middle-strike calls and buys one high-strike call. Its idealized expiry peak occurs at the middle strike.
Formula: Peak profit = wing width - net debit
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Forgetting the two short middle options produces the wrong payoff shape.
Option sensitivities
First-order delta estimate
Delta approximates the local change in an option's value for a small underlying-price change, holding other inputs fixed. A constant-delta approximation becomes less reliable for large moves.
Formula: Approximate option change = delta x underlying change
Download all ten SVGs for this concept
- Scenario 01 SVG — Fixed local delta -0.8; all other inputs fixed
- Scenario 02 SVG — Fixed local delta -0.6; all other inputs fixed
- Scenario 03 SVG — Fixed local delta -0.4; all other inputs fixed
- Scenario 04 SVG — Fixed local delta -0.2; all other inputs fixed
- Scenario 05 SVG — Fixed local delta 0.1; all other inputs fixed
- Scenario 06 SVG — Fixed local delta 0.25; all other inputs fixed
- Scenario 07 SVG — Fixed local delta 0.4; all other inputs fixed
- Scenario 08 SVG — Fixed local delta 0.55; all other inputs fixed
- Scenario 09 SVG — Fixed local delta 0.7; all other inputs fixed
- Scenario 10 SVG — Fixed local delta 0.9; all other inputs fixed
Common mistake: Extending a local linear estimate across a large price move ignores changing delta and other inputs.
Option sensitivities
Underlying units for a delta offset
Multiplying option delta by contract multiplier and contract quantity gives a local underlying-equivalent exposure. An opposite underlying position offsets that estimate at the current inputs.
Formula: Hedge units = -delta x multiplier x contracts
Download all ten SVGs for this concept
- Scenario 01 SVG — Long options with delta -0.8; multiplier 100
- Scenario 02 SVG — Long options with delta -0.6; multiplier 100
- Scenario 03 SVG — Long options with delta -0.4; multiplier 100
- Scenario 04 SVG — Long options with delta -0.2; multiplier 100
- Scenario 05 SVG — Long options with delta 0.1; multiplier 100
- Scenario 06 SVG — Long options with delta 0.25; multiplier 100
- Scenario 07 SVG — Long options with delta 0.4; multiplier 100
- Scenario 08 SVG — Long options with delta 0.55; multiplier 100
- Scenario 09 SVG — Long options with delta 0.7; multiplier 100
- Scenario 10 SVG — Long options with delta 0.9; multiplier 100
Common mistake: Treating a one-time delta offset as permanent ignores gamma and changing market inputs.
Option sensitivities
Gamma and changing delta
Gamma approximates how much delta changes for a small underlying-price movement. This is another local approximation and should not be extrapolated without checking the pricing model.
Formula: Approximate delta change = gamma x underlying change
Download all ten SVGs for this concept
- Scenario 01 SVG — Local gamma 0.01 per underlying unit
- Scenario 02 SVG — Local gamma 0.015 per underlying unit
- Scenario 03 SVG — Local gamma 0.02 per underlying unit
- Scenario 04 SVG — Local gamma 0.025 per underlying unit
- Scenario 05 SVG — Local gamma 0.03 per underlying unit
- Scenario 06 SVG — Local gamma 0.035 per underlying unit
- Scenario 07 SVG — Local gamma 0.04 per underlying unit
- Scenario 08 SVG — Local gamma 0.045 per underlying unit
- Scenario 09 SVG — Local gamma 0.05 per underlying unit
- Scenario 10 SVG — Local gamma 0.055 per underlying unit
Common mistake: Adding gamma directly to option price confuses a change in delta with a change in value.
Option sensitivities
Vega and volatility-point changes
Vega estimates an option-value change for a small implied-volatility change. Quote conventions matter: this worksheet uses vega per one percentage point of volatility.
Formula: Approximate value change = vega per point x volatility-point change
Download all ten SVGs for this concept
- Scenario 01 SVG — Vega 0.1 per one volatility percentage point
- Scenario 02 SVG — Vega 0.2 per one volatility percentage point
- Scenario 03 SVG — Vega 0.3 per one volatility percentage point
- Scenario 04 SVG — Vega 0.4 per one volatility percentage point
- Scenario 05 SVG — Vega 0.5 per one volatility percentage point
- Scenario 06 SVG — Vega 0.6 per one volatility percentage point
- Scenario 07 SVG — Vega 0.7 per one volatility percentage point
- Scenario 08 SVG — Vega 0.8 per one volatility percentage point
- Scenario 09 SVG — Vega 0.9 per one volatility percentage point
- Scenario 10 SVG — Vega 1 per one volatility percentage point
Common mistake: Using a decimal volatility change with a per-percentage-point vega creates a factor-of-100 error.
Option sensitivities
A short-horizon theta estimate
Theta is a local estimate of option-value change as time passes with other inputs held fixed. A daily theta should not be assumed constant throughout the remaining life.
Formula: Approximate time change = daily theta x elapsed days
Download all ten SVGs for this concept
- Scenario 01 SVG — Daily theta -0.01; a local constant-theta estimate
- Scenario 02 SVG — Daily theta -0.02; a local constant-theta estimate
- Scenario 03 SVG — Daily theta -0.03; a local constant-theta estimate
- Scenario 04 SVG — Daily theta -0.04; a local constant-theta estimate
- Scenario 05 SVG — Daily theta -0.05; a local constant-theta estimate
- Scenario 06 SVG — Daily theta -0.06; a local constant-theta estimate
- Scenario 07 SVG — Daily theta -0.07; a local constant-theta estimate
- Scenario 08 SVG — Daily theta -0.08; a local constant-theta estimate
- Scenario 09 SVG — Daily theta -0.09; a local constant-theta estimate
- Scenario 10 SVG — Daily theta -0.10; a local constant-theta estimate
Common mistake: Projecting one day's theta over months ignores changing time sensitivity and other pricing inputs.
Option sensitivities
Zero-rate put-call parity check
For European options with one strike and expiry on a non-dividend-paying underlying, zero-rate parity links the call-minus-put price with spot-minus-strike. The worksheet deliberately assumes zero interest.
Formula: Parity residual = call - put - (spot - strike)
Download all ten SVGs for this concept
- Scenario 01 SVG — European, no dividends, zero rates; spot 100, strike 100
- Scenario 02 SVG — European, no dividends, zero rates; spot 110, strike 100
- Scenario 03 SVG — European, no dividends, zero rates; spot 120, strike 100
- Scenario 04 SVG — European, no dividends, zero rates; spot 130, strike 100
- Scenario 05 SVG — European, no dividends, zero rates; spot 140, strike 100
- Scenario 06 SVG — European, no dividends, zero rates; spot 150, strike 100
- Scenario 07 SVG — European, no dividends, zero rates; spot 160, strike 100
- Scenario 08 SVG — European, no dividends, zero rates; spot 170, strike 100
- Scenario 09 SVG — European, no dividends, zero rates; spot 180, strike 100
- Scenario 10 SVG — European, no dividends, zero rates; spot 190, strike 100
Common mistake: Applying the zero-rate identity to dividends, nonzero rates or inconsistent quotes creates a false discrepancy.
Option sensitivities
Scaling option P/L by contract size
A per-unit change in option premium must be multiplied by the contract multiplier and signed contract quantity to obtain gross currency P/L. Contract specifications determine the multiplier.
Formula: Gross P/L = premium change x multiplier x signed contracts
Download all ten SVGs for this concept
- Scenario 01 SVG — Long 2 contracts; synthetic multiplier 10
- Scenario 02 SVG — Long 2 contracts; synthetic multiplier 20
- Scenario 03 SVG — Long 2 contracts; synthetic multiplier 25
- Scenario 04 SVG — Long 2 contracts; synthetic multiplier 40
- Scenario 05 SVG — Long 2 contracts; synthetic multiplier 50
- Scenario 06 SVG — Long 2 contracts; synthetic multiplier 75
- Scenario 07 SVG — Long 2 contracts; synthetic multiplier 100
- Scenario 08 SVG — Long 2 contracts; synthetic multiplier 125
- Scenario 09 SVG — Long 2 contracts; synthetic multiplier 200
- Scenario 10 SVG — Long 2 contracts; synthetic multiplier 250
Common mistake: Using the premium quote as the currency P/L for a full contract omits the contract size.
Option sensitivities
Synthetic-long expiry arithmetic
A long call and short put at the same strike and expiry have a combined expiry payoff equal to underlying minus strike. Their initial net premium determines the eventual P/L.
Formula: Expiry P/L = underlying - strike - net debit
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Calling the position fully paid because its premium is small ignores its linear downside and collateral needs.
Option sensitivities
Long-strangle expiry thresholds
A long strangle buys an out-of-the-money put and call at different strikes with the same expiry. The put strike minus total premium and call strike plus total premium are the idealized break-evens.
Formula: Break-evens = put strike - debit; call strike + debit
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Measuring the required move from only one strike hides the full loss zone between the thresholds.
Option sensitivities
Equal-width iron-condor risk
A same-expiry iron condor combines a put credit spread and a call credit spread. For non-overlapping equal-width wings, idealized expiry maximum loss is one wing width less the total credit.
Formula: Maximum loss = wing width - total credit
Download all ten SVGs for this concept
- Scenario 01 SVG — Synthetic expiry scenario; reference strike 100
- Scenario 02 SVG — Synthetic expiry scenario; reference strike 110
- Scenario 03 SVG — Synthetic expiry scenario; reference strike 120
- Scenario 04 SVG — Synthetic expiry scenario; reference strike 130
- Scenario 05 SVG — Synthetic expiry scenario; reference strike 140
- Scenario 06 SVG — Synthetic expiry scenario; reference strike 150
- Scenario 07 SVG — Synthetic expiry scenario; reference strike 160
- Scenario 08 SVG — Synthetic expiry scenario; reference strike 170
- Scenario 09 SVG — Synthetic expiry scenario; reference strike 180
- Scenario 10 SVG — Synthetic expiry scenario; reference strike 190
Common mistake: Adding both wing losses at one expiry price double-counts mutually exclusive tails in the idealized payoff.
Price and indicators
Candle body as a share of range
The absolute open-to-close body divided by the high-to-low range measures how much of a candle's total range is occupied by the body. It does not identify future direction.
Formula: Body fraction = abs(close - open) / (high - low)
Download all ten SVGs for this concept
- Scenario 01 SVG — Low 100; high 110; open 100; increasing closes
- Scenario 02 SVG — Low 110; high 122; open 110; increasing closes
- Scenario 03 SVG — Low 120; high 134; open 120; increasing closes
- Scenario 04 SVG — Low 130; high 146; open 130; increasing closes
- Scenario 05 SVG — Low 140; high 158; open 140; increasing closes
- Scenario 06 SVG — Low 150; high 170; open 150; increasing closes
- Scenario 07 SVG — Low 160; high 182; open 160; increasing closes
- Scenario 08 SVG — Low 170; high 194; open 170; increasing closes
- Scenario 09 SVG — Low 180; high 206; open 180; increasing closes
- Scenario 10 SVG — Low 190; high 218; open 190; increasing closes
Common mistake: Dividing by zero for a flat bar or interpreting a large body as certainty produces invalid conclusions.
Price and indicators
Close location within a bar
Close location places the closing price between the low and high on a zero-to-one scale. It is a compact description of one completed bar, not a standalone trading signal.
Formula: Close location = (close - low) / (high - low)
Download all ten SVGs for this concept
- Scenario 01 SVG — Low 100; high 110; vary close location
- Scenario 02 SVG — Low 110; high 122; vary close location
- Scenario 03 SVG — Low 120; high 134; vary close location
- Scenario 04 SVG — Low 130; high 146; vary close location
- Scenario 05 SVG — Low 140; high 158; vary close location
- Scenario 06 SVG — Low 150; high 170; vary close location
- Scenario 07 SVG — Low 160; high 182; vary close location
- Scenario 08 SVG — Low 170; high 194; vary close location
- Scenario 09 SVG — Low 180; high 206; vary close location
- Scenario 10 SVG — Low 190; high 218; vary close location
Common mistake: Calling a high close a bullish forecast confuses a measurement with a prediction.
Price and indicators
True range and previous close
True range is the largest of the bar range and the two distances from the prior close. Including the previous close allows an overnight gap to influence the measurement.
Formula: TR = max(high-low, abs(high-prev close), abs(low-prev close))
Download all ten SVGs for this concept
- Scenario 01 SVG — Current low 100; high 110; prior close varies
- Scenario 02 SVG — Current low 110; high 120; prior close varies
- Scenario 03 SVG — Current low 120; high 130; prior close varies
- Scenario 04 SVG — Current low 130; high 140; prior close varies
- Scenario 05 SVG — Current low 140; high 150; prior close varies
- Scenario 06 SVG — Current low 150; high 160; prior close varies
- Scenario 07 SVG — Current low 160; high 170; prior close varies
- Scenario 08 SVG — Current low 170; high 180; prior close varies
- Scenario 09 SVG — Current low 180; high 190; prior close varies
- Scenario 10 SVG — Current low 190; high 200; prior close varies
Common mistake: Using only high-minus-low omits a gap outside the new bar's range.
Price and indicators
Simple moving average window
A simple moving average assigns equal weight to each observation in a fixed trailing window. When a new observation enters, the oldest observation leaves the window.
Formula: SMA = sum(window closes) / window length
Download all ten SVGs for this concept
- Scenario 01 SVG — Five-close SMA; first four closes 97, 99, 101, 103
- Scenario 02 SVG — Five-close SMA; first four closes 107, 109, 111, 113
- Scenario 03 SVG — Five-close SMA; first four closes 117, 119, 121, 123
- Scenario 04 SVG — Five-close SMA; first four closes 127, 129, 131, 133
- Scenario 05 SVG — Five-close SMA; first four closes 137, 139, 141, 143
- Scenario 06 SVG — Five-close SMA; first four closes 147, 149, 151, 153
- Scenario 07 SVG — Five-close SMA; first four closes 157, 159, 161, 163
- Scenario 08 SVG — Five-close SMA; first four closes 167, 169, 171, 173
- Scenario 09 SVG — Five-close SMA; first four closes 177, 179, 181, 183
- Scenario 10 SVG — Five-close SMA; first four closes 187, 189, 191, 193
Common mistake: Calculating with future closes introduces information unavailable at the time of the signal.
Price and indicators
One exponential-average update
An exponential moving average updates the prior average using the current observation and a smoothing factor. The chosen initialization can affect early values in a series.
Formula: EMA new = alpha x close + (1 - alpha) x EMA old
Download all ten SVGs for this concept
- Scenario 01 SVG — Previous EMA 100; smoothing alpha 0.500
- Scenario 02 SVG — Previous EMA 110; smoothing alpha 0.400
- Scenario 03 SVG — Previous EMA 120; smoothing alpha 0.333
- Scenario 04 SVG — Previous EMA 130; smoothing alpha 0.286
- Scenario 05 SVG — Previous EMA 140; smoothing alpha 0.222
- Scenario 06 SVG — Previous EMA 150; smoothing alpha 0.182
- Scenario 07 SVG — Previous EMA 160; smoothing alpha 0.154
- Scenario 08 SVG — Previous EMA 170; smoothing alpha 0.125
- Scenario 09 SVG — Previous EMA 180; smoothing alpha 0.095
- Scenario 10 SVG — Previous EMA 190; smoothing alpha 0.065
Common mistake: Ignoring the initialization rule makes two implementations appear inconsistent even when their updates match.
Price and indicators
Linearly weighted moving average
A weighted moving average gives more influence to chosen observations. This worksheet uses linearly increasing weights from oldest to newest, normalized by their sum.
Formula: WMA = sum(price x weight) / sum(weights)
Download all ten SVGs for this concept
- Scenario 01 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 02 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 03 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 04 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 05 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 06 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 07 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 08 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 09 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
- Scenario 10 SVG — Five-close WMA; weights 1 to 5 from oldest to newest
Common mistake: Reversing the weight order gives the oldest observation the greatest influence.
Price and indicators
Price rate of change
Rate of change expresses a price difference relative to the earlier price. It is a percentage change over a specified lookback and is not comparable without that horizon.
Formula: ROC = (current / earlier - 1) x 100
Download all ten SVGs for this concept
- Scenario 01 SVG — Lookback reference price 100
- Scenario 02 SVG — Lookback reference price 110
- Scenario 03 SVG — Lookback reference price 120
- Scenario 04 SVG — Lookback reference price 130
- Scenario 05 SVG — Lookback reference price 140
- Scenario 06 SVG — Lookback reference price 150
- Scenario 07 SVG — Lookback reference price 160
- Scenario 08 SVG — Lookback reference price 170
- Scenario 09 SVG — Lookback reference price 180
- Scenario 10 SVG — Lookback reference price 190
Common mistake: Comparing a one-day ROC with a one-month ROC without naming horizons mixes different questions.
Price and indicators
RSI from average gains and losses
The RSI transformation maps the ratio of smoothed average gains to smoothed average losses onto a zero-to-100 scale. This worksheet begins with supplied averages rather than choosing a smoothing implementation.
Formula: RSI = 100 - 100 / (1 + average gain / average loss)
Download all ten SVGs for this concept
- Scenario 01 SVG — Supplied smoothed average loss 0.5
- Scenario 02 SVG — Supplied smoothed average loss 0.75
- Scenario 03 SVG — Supplied smoothed average loss 1
- Scenario 04 SVG — Supplied smoothed average loss 1.25
- Scenario 05 SVG — Supplied smoothed average loss 1.5
- Scenario 06 SVG — Supplied smoothed average loss 1.75
- Scenario 07 SVG — Supplied smoothed average loss 2
- Scenario 08 SVG — Supplied smoothed average loss 2.25
- Scenario 09 SVG — Supplied smoothed average loss 2.5
- Scenario 10 SVG — Supplied smoothed average loss 2.75
Common mistake: Assuming every RSI implementation seeds its averages identically can create unexplained early differences.
Price and indicators
Close position in a lookback range
The raw stochastic percent-K value places the latest close inside the highest-high to lowest-low range of a chosen lookback. Smoothing choices create additional indicator variants.
Formula: Percent K = 100 x (close - lowest low) / (highest high - lowest low)
Download all ten SVGs for this concept
- Scenario 01 SVG — Lookback low 100; high 120; unsmoothed %K
- Scenario 02 SVG — Lookback low 110; high 131; unsmoothed %K
- Scenario 03 SVG — Lookback low 120; high 142; unsmoothed %K
- Scenario 04 SVG — Lookback low 130; high 153; unsmoothed %K
- Scenario 05 SVG — Lookback low 140; high 164; unsmoothed %K
- Scenario 06 SVG — Lookback low 150; high 175; unsmoothed %K
- Scenario 07 SVG — Lookback low 160; high 186; unsmoothed %K
- Scenario 08 SVG — Lookback low 170; high 197; unsmoothed %K
- Scenario 09 SVG — Lookback low 180; high 208; unsmoothed %K
- Scenario 10 SVG — Lookback low 190; high 219; unsmoothed %K
Common mistake: Using the current candle range instead of the full lookback range changes the intended measure.
Price and indicators
Population dispersion of closes
Population standard deviation measures the root mean squared distance of observations from their mean. Dividing by the full count is a stated descriptive convention, distinct from sample estimation.
Formula: Population SD = sqrt(sum((price - mean)^2) / n)
Download all ten SVGs for this concept
- Scenario 01 SVG — Three closes: 100-d, 100, 100+d
- Scenario 02 SVG — Three closes: 110-d, 110, 110+d
- Scenario 03 SVG — Three closes: 120-d, 120, 120+d
- Scenario 04 SVG — Three closes: 130-d, 130, 130+d
- Scenario 05 SVG — Three closes: 140-d, 140, 140+d
- Scenario 06 SVG — Three closes: 150-d, 150, 150+d
- Scenario 07 SVG — Three closes: 160-d, 160, 160+d
- Scenario 08 SVG — Three closes: 170-d, 170, 170+d
- Scenario 09 SVG — Three closes: 180-d, 180, 180+d
- Scenario 10 SVG — Three closes: 190-d, 190, 190+d
Common mistake: Mixing population and sample denominators leads to different band values with the same data.
Price and indicators
Symmetric standard-deviation band width
For bands placed equally above and below a moving average, total band width is twice the chosen multiple of standard deviation. A percentage width divides that distance by the center value.
Formula: Band width percent = 100 x (2 x k x SD) / mean
Download all ten SVGs for this concept
- Scenario 01 SVG — Band center 100; bands at plus/minus 2 SD
- Scenario 02 SVG — Band center 110; bands at plus/minus 2 SD
- Scenario 03 SVG — Band center 120; bands at plus/minus 2 SD
- Scenario 04 SVG — Band center 130; bands at plus/minus 2 SD
- Scenario 05 SVG — Band center 140; bands at plus/minus 2 SD
- Scenario 06 SVG — Band center 150; bands at plus/minus 2 SD
- Scenario 07 SVG — Band center 160; bands at plus/minus 2 SD
- Scenario 08 SVG — Band center 170; bands at plus/minus 2 SD
- Scenario 09 SVG — Band center 180; bands at plus/minus 2 SD
- Scenario 10 SVG — Band center 190; bands at plus/minus 2 SD
Common mistake: Treating a narrow historical band as a guarantee of the next move's direction goes beyond the measurement.
Price and indicators
ATR as a share of price
Normalizing an average true range by price converts a currency range measure into a percentage. It allows rough proportional comparisons while preserving the chosen averaging and lookback assumptions.
Formula: ATR percent = ATR / reference price x 100
Download all ten SVGs for this concept
- Scenario 01 SVG — Reference price 100; compare proportional ATR
- Scenario 02 SVG — Reference price 110; compare proportional ATR
- Scenario 03 SVG — Reference price 120; compare proportional ATR
- Scenario 04 SVG — Reference price 130; compare proportional ATR
- Scenario 05 SVG — Reference price 140; compare proportional ATR
- Scenario 06 SVG — Reference price 150; compare proportional ATR
- Scenario 07 SVG — Reference price 160; compare proportional ATR
- Scenario 08 SVG — Reference price 170; compare proportional ATR
- Scenario 09 SVG — Reference price 180; compare proportional ATR
- Scenario 10 SVG — Reference price 190; compare proportional ATR
Common mistake: Comparing raw ATR across differently priced instruments can confuse scale with relative variability.
Volume and auction
Volume-weighted average trade price
VWAP weights each observed trade price by its executed volume. Exact trade-level VWAP differs from an estimate that replaces every trade in a bar with a representative bar price.
Formula: VWAP = sum(trade price x volume) / sum(volume)
Download all ten SVGs for this concept
- Scenario 01 SVG — 100 units trade at 100; compare volume at 110
- Scenario 02 SVG — 100 units trade at 110; compare volume at 120
- Scenario 03 SVG — 100 units trade at 120; compare volume at 130
- Scenario 04 SVG — 100 units trade at 130; compare volume at 140
- Scenario 05 SVG — 100 units trade at 140; compare volume at 150
- Scenario 06 SVG — 100 units trade at 150; compare volume at 160
- Scenario 07 SVG — 100 units trade at 160; compare volume at 170
- Scenario 08 SVG — 100 units trade at 170; compare volume at 180
- Scenario 09 SVG — 100 units trade at 180; compare volume at 190
- Scenario 10 SVG — 100 units trade at 190; compare volume at 200
Common mistake: Calling an OHLC proxy an exact trade-level VWAP hides the approximation in the input data.
Volume and auction
Volume relative to a baseline
Relative volume divides current observed volume by a defined reference volume. A time-of-day comparison should use a time-matched baseline rather than a completed full-session total.
Formula: Relative volume = observed volume / baseline volume
Download all ten SVGs for this concept
- Scenario 01 SVG — Matched-window baseline 1000 volume units
- Scenario 02 SVG — Matched-window baseline 1500 volume units
- Scenario 03 SVG — Matched-window baseline 2000 volume units
- Scenario 04 SVG — Matched-window baseline 2500 volume units
- Scenario 05 SVG — Matched-window baseline 3000 volume units
- Scenario 06 SVG — Matched-window baseline 3500 volume units
- Scenario 07 SVG — Matched-window baseline 4000 volume units
- Scenario 08 SVG — Matched-window baseline 4500 volume units
- Scenario 09 SVG — Matched-window baseline 5000 volume units
- Scenario 10 SVG — Matched-window baseline 5500 volume units
Common mistake: Comparing an early partial session with a full-day baseline can make activity appear artificially low.
Volume and auction
Aggressor-classified volume delta
Under a stated trade-classification method, delta subtracts sell-aggressor volume from buy-aggressor volume. It describes classified executions rather than all resting interest or future direction.
Formula: Delta = buy-aggressor volume - sell-aggressor volume
Download all ten SVGs for this concept
- Scenario 01 SVG — Total classified volume 1000; buy share varies
- Scenario 02 SVG — Total classified volume 1500; buy share varies
- Scenario 03 SVG — Total classified volume 2000; buy share varies
- Scenario 04 SVG — Total classified volume 2500; buy share varies
- Scenario 05 SVG — Total classified volume 3000; buy share varies
- Scenario 06 SVG — Total classified volume 3500; buy share varies
- Scenario 07 SVG — Total classified volume 4000; buy share varies
- Scenario 08 SVG — Total classified volume 4500; buy share varies
- Scenario 09 SVG — Total classified volume 5000; buy share varies
- Scenario 10 SVG — Total classified volume 5500; buy share varies
Common mistake: Treating positive delta as proof of rising future prices ignores passive supply and classification limits.
Volume and auction
Delta as a share of classified volume
Dividing classified volume delta by total classified volume normalizes the imbalance. A large fraction on tiny total volume can still represent little absolute trading activity.
Formula: Delta fraction = (buy volume - sell volume) / (buy volume + sell volume)
Download all ten SVGs for this concept
- Scenario 01 SVG — Total classified volume 1000; buy share varies
- Scenario 02 SVG — Total classified volume 1500; buy share varies
- Scenario 03 SVG — Total classified volume 2000; buy share varies
- Scenario 04 SVG — Total classified volume 2500; buy share varies
- Scenario 05 SVG — Total classified volume 3000; buy share varies
- Scenario 06 SVG — Total classified volume 3500; buy share varies
- Scenario 07 SVG — Total classified volume 4000; buy share varies
- Scenario 08 SVG — Total classified volume 4500; buy share varies
- Scenario 09 SVG — Total classified volume 5000; buy share varies
- Scenario 10 SVG — Total classified volume 5500; buy share varies
Common mistake: Reporting the fraction without total volume hides whether the imbalance is economically small.
Volume and auction
Cumulative classified delta
Cumulative delta is the running sum of classified buy-minus-sell volume over a defined anchor. Changing the start point changes the level of the cumulative series.
Formula: Cumulative delta = running sum(period delta)
Download all ten SVGs for this concept
- Scenario 01 SVG — Anchor starts at zero; delta scale 1
- Scenario 02 SVG — Anchor starts at zero; delta scale 2
- Scenario 03 SVG — Anchor starts at zero; delta scale 3
- Scenario 04 SVG — Anchor starts at zero; delta scale 4
- Scenario 05 SVG — Anchor starts at zero; delta scale 5
- Scenario 06 SVG — Anchor starts at zero; delta scale 6
- Scenario 07 SVG — Anchor starts at zero; delta scale 7
- Scenario 08 SVG — Anchor starts at zero; delta scale 8
- Scenario 09 SVG — Anchor starts at zero; delta scale 9
- Scenario 10 SVG — Anchor starts at zero; delta scale 10
Common mistake: Comparing series with different anchors as if their levels were directly equivalent creates a false difference.
Volume and auction
On-balance-volume updates
On-balance volume adds a bar's volume when its close rises, subtracts it when the close falls, and leaves it unchanged for an unchanged close under this convention.
Formula: OBV update = prior OBV plus or minus volume by close direction
Download all ten SVGs for this concept
- Scenario 01 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 02 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 03 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 04 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 05 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 06 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 07 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 08 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 09 SVG — Initial OBV zero; equal-close bars add zero
- Scenario 10 SVG — Initial OBV zero; equal-close bars add zero
Common mistake: Using intrabar direction instead of close-to-close direction changes the stated indicator.
Volume and auction
Volume-weighted moving average
A volume-weighted moving average weights prices within a rolling fixed window by volume. Unlike an anchored VWAP, its oldest observation leaves as the window advances.
Formula: VWMA = sum(window price x volume) / sum(window volume)
Download all ten SVGs for this concept
- Scenario 01 SVG — 100 units trade at 100; compare volume at 110
- Scenario 02 SVG — 100 units trade at 110; compare volume at 120
- Scenario 03 SVG — 100 units trade at 120; compare volume at 130
- Scenario 04 SVG — 100 units trade at 130; compare volume at 140
- Scenario 05 SVG — 100 units trade at 140; compare volume at 150
- Scenario 06 SVG — 100 units trade at 150; compare volume at 160
- Scenario 07 SVG — 100 units trade at 160; compare volume at 170
- Scenario 08 SVG — 100 units trade at 170; compare volume at 180
- Scenario 09 SVG — 100 units trade at 180; compare volume at 190
- Scenario 10 SVG — 100 units trade at 190; compare volume at 200
Common mistake: Using a cumulative denominator with a rolling numerator produces a calculation that is neither VWMA nor VWAP.
Volume and auction
Volume-profile point of control
The volume point of control is a price bin with the largest recorded traded volume under a specified binning scheme. A different bin size or tie rule can change the selected level.
Formula: POC = price bin with maximum volume
Download all ten SVGs for this concept
- Scenario 01 SVG — Five equal price bins; total 1200 volume units
- Scenario 02 SVG — Five equal price bins; total 1000 volume units
- Scenario 03 SVG — Five equal price bins; total 1000 volume units
- Scenario 04 SVG — Five equal price bins; total 1000 volume units
- Scenario 05 SVG — Five equal price bins; total 1000 volume units
- Scenario 06 SVG — Five equal price bins; total 1000 volume units
- Scenario 07 SVG — Five equal price bins; total 1000 volume units
- Scenario 08 SVG — Five equal price bins; total 1000 volume units
- Scenario 09 SVG — Five equal price bins; total 1000 volume units
- Scenario 10 SVG — Five equal price bins; total 1000 volume units
Common mistake: Treating a bin-based POC as one exact universally agreed price ignores aggregation choices.
Volume and auction
Coverage of selected profile bins
Value-area coverage is the share of total profile volume included by a chosen set of price bins. This arithmetic check does not prescribe the algorithm used to select contiguous bins.
Formula: Coverage = volume in selected bins / total profile volume
Download all ten SVGs for this concept
- Scenario 01 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 02 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 03 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 04 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 05 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 06 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 07 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 08 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 09 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
- Scenario 10 SVG — Fixed expansion order: center, lower, upper, outer lower, outer upper
Common mistake: Assuming every platform selects the same value area ignores expansion and tie-handling conventions.
Volume and auction
TPO point of control by counts
A TPO point of control is a price bin with the greatest number of qualifying time brackets. It measures time-based presence, which can differ from volume-based concentration.
Formula: TPO POC = bin with maximum time-bracket count
Download all ten SVGs for this concept
- Scenario 01 SVG — Fixed brackets and price bins; 5 maximum TPO count
- Scenario 02 SVG — Fixed brackets and price bins; 4 maximum TPO count
- Scenario 03 SVG — Fixed brackets and price bins; 6 maximum TPO count
- Scenario 04 SVG — Fixed brackets and price bins; 5 maximum TPO count
- Scenario 05 SVG — Fixed brackets and price bins; 6 maximum TPO count
- Scenario 06 SVG — Fixed brackets and price bins; 6 maximum TPO count
- Scenario 07 SVG — Fixed brackets and price bins; 5 maximum TPO count
- Scenario 08 SVG — Fixed brackets and price bins; 7 maximum TPO count
- Scenario 09 SVG — Fixed brackets and price bins; 6 maximum TPO count
- Scenario 10 SVG — Fixed brackets and price bins; 7 maximum TPO count
Common mistake: Substituting volume counts for time brackets turns a TPO profile into another measurement.
Auction and levels
Initial-balance range
The initial-balance range is the high-minus-low over a predefined opening interval. The interval is part of the definition and must be fixed before comparing sessions.
Formula: IB range = opening-interval high - opening-interval low
Download all ten SVGs for this concept
- Scenario 01 SVG — Fixed opening interval; low 100; compare interval highs
- Scenario 02 SVG — Fixed opening interval; low 110; compare interval highs
- Scenario 03 SVG — Fixed opening interval; low 120; compare interval highs
- Scenario 04 SVG — Fixed opening interval; low 130; compare interval highs
- Scenario 05 SVG — Fixed opening interval; low 140; compare interval highs
- Scenario 06 SVG — Fixed opening interval; low 150; compare interval highs
- Scenario 07 SVG — Fixed opening interval; low 160; compare interval highs
- Scenario 08 SVG — Fixed opening interval; low 170; compare interval highs
- Scenario 09 SVG — Fixed opening interval; low 180; compare interval highs
- Scenario 10 SVG — Fixed opening interval; low 190; compare interval highs
Common mistake: Changing the opening interval after viewing the session introduces hindsight into comparisons.
Auction and levels
Opening gap relative to prior close
An opening gap measures the difference between a new session's opening price and the previous close. As a percentage, it uses the prior close as the denominator.
Formula: Gap percent = (open - prior close) / prior close x 100
Download all ten SVGs for this concept
- Scenario 01 SVG — Previous close 100; compare session opening prices
- Scenario 02 SVG — Previous close 110; compare session opening prices
- Scenario 03 SVG — Previous close 120; compare session opening prices
- Scenario 04 SVG — Previous close 130; compare session opening prices
- Scenario 05 SVG — Previous close 140; compare session opening prices
- Scenario 06 SVG — Previous close 150; compare session opening prices
- Scenario 07 SVG — Previous close 160; compare session opening prices
- Scenario 08 SVG — Previous close 170; compare session opening prices
- Scenario 09 SVG — Previous close 180; compare session opening prices
- Scenario 10 SVG — Previous close 190; compare session opening prices
Common mistake: Comparing an adjusted previous close with an unadjusted open can create a synthetic gap.
Auction and levels
Classic pivot arithmetic
The classic central pivot is the arithmetic average of the previous period's high, low and close. It is a deterministic reference level, not evidence that price will react there.
Formula: Pivot P = (prior high + prior low + prior close) / 3
Download all ten SVGs for this concept
- Scenario 01 SVG — Prior high 110; low 90; vary prior close
- Scenario 02 SVG — Prior high 120; low 100; vary prior close
- Scenario 03 SVG — Prior high 130; low 110; vary prior close
- Scenario 04 SVG — Prior high 140; low 120; vary prior close
- Scenario 05 SVG — Prior high 150; low 130; vary prior close
- Scenario 06 SVG — Prior high 160; low 140; vary prior close
- Scenario 07 SVG — Prior high 170; low 150; vary prior close
- Scenario 08 SVG — Prior high 180; low 160; vary prior close
- Scenario 09 SVG — Prior high 190; low 170; vary prior close
- Scenario 10 SVG — Prior high 200; low 180; vary prior close
Common mistake: Using the current unfinished session's high and low changes a prior-period pivot definition.
Auction and levels
Classic first support and resistance
Classic first support and resistance reflect the prior high and low around twice the central pivot. They are calculated reference levels whose usefulness requires separate testing.
Formula: R1 = 2P - prior low; S1 = 2P - prior high
Download all ten SVGs for this concept
- Scenario 01 SVG — Prior high 110; low 90; first classic bands
- Scenario 02 SVG — Prior high 120; low 100; first classic bands
- Scenario 03 SVG — Prior high 130; low 110; first classic bands
- Scenario 04 SVG — Prior high 140; low 120; first classic bands
- Scenario 05 SVG — Prior high 150; low 130; first classic bands
- Scenario 06 SVG — Prior high 160; low 140; first classic bands
- Scenario 07 SVG — Prior high 170; low 150; first classic bands
- Scenario 08 SVG — Prior high 180; low 160; first classic bands
- Scenario 09 SVG — Prior high 190; low 170; first classic bands
- Scenario 10 SVG — Prior high 200; low 180; first classic bands
Common mistake: Mixing a pivot from one session with a high and low from another produces invalid levels.
Auction and levels
Central pivot range width
The central pivot range uses the midpoint of the prior high and low and its reflection around the classic pivot. Taking the absolute difference keeps width positive regardless of ordering.
Formula: BC = (H+L)/2; TC = 2P-BC; width = abs(TC-BC)
Download all ten SVGs for this concept
- Scenario 01 SVG — Prior high 110; low 90; midpoint BC 100
- Scenario 02 SVG — Prior high 120; low 100; midpoint BC 110
- Scenario 03 SVG — Prior high 130; low 110; midpoint BC 120
- Scenario 04 SVG — Prior high 140; low 120; midpoint BC 130
- Scenario 05 SVG — Prior high 150; low 130; midpoint BC 140
- Scenario 06 SVG — Prior high 160; low 140; midpoint BC 150
- Scenario 07 SVG — Prior high 170; low 150; midpoint BC 160
- Scenario 08 SVG — Prior high 180; low 160; midpoint BC 170
- Scenario 09 SVG — Prior high 190; low 170; midpoint BC 180
- Scenario 10 SVG — Prior high 200; low 180; midpoint BC 190
Common mistake: Assuming the value named TC is always numerically higher than BC can invert a plotted band.
Auction and levels
Retracement depth of an upswing
Retracement depth compares a pullback from an identified swing high with the size of the preceding upswing. The chosen swing anchors determine the result and should be selected by a fixed rule.
Formula: Depth = (swing high - pullback price) / (swing high - swing low)
Download all ten SVGs for this concept
- Scenario 01 SVG — Upswing from 80 to 100; pullback depths
- Scenario 02 SVG — Upswing from 90 to 110; pullback depths
- Scenario 03 SVG — Upswing from 100 to 120; pullback depths
- Scenario 04 SVG — Upswing from 110 to 130; pullback depths
- Scenario 05 SVG — Upswing from 120 to 140; pullback depths
- Scenario 06 SVG — Upswing from 130 to 150; pullback depths
- Scenario 07 SVG — Upswing from 140 to 160; pullback depths
- Scenario 08 SVG — Upswing from 150 to 170; pullback depths
- Scenario 09 SVG — Upswing from 160 to 180; pullback depths
- Scenario 10 SVG — Upswing from 170 to 190; pullback depths
Common mistake: Choosing anchors after seeing the outcome can make an arbitrary move fit a preferred percentage.
Auction and levels
Equal-leg projection arithmetic
An equal-leg projection adds the size of a previous price leg to a later anchor. It is a geometric reference and does not supply a probability that price will reach the projected level.
Formula: Projection = new anchor + (first-leg end - first-leg start)
Download all ten SVGs for this concept
- Scenario 01 SVG — First leg 90 to 110; length 20
- Scenario 02 SVG — First leg 100 to 120; length 20
- Scenario 03 SVG — First leg 110 to 130; length 20
- Scenario 04 SVG — First leg 120 to 140; length 20
- Scenario 05 SVG — First leg 130 to 150; length 20
- Scenario 06 SVG — First leg 140 to 160; length 20
- Scenario 07 SVG — First leg 150 to 170; length 20
- Scenario 08 SVG — First leg 160 to 180; length 20
- Scenario 09 SVG — First leg 170 to 190; length 20
- Scenario 10 SVG — First leg 180 to 200; length 20
Common mistake: Calling a calculated projection a promised target confuses arithmetic with empirical evidence.
Auction and levels
Distance from a reference level
A normalized distance expresses how far price is from a chosen reference level in units of an assumed ATR. It describes proximity and does not confirm that the level has held.
Formula: ATR distance = (price - reference level) / ATR
Download all ten SVGs for this concept
- Scenario 01 SVG — Reference 100; ATR 1
- Scenario 02 SVG — Reference 110; ATR 1.5
- Scenario 03 SVG — Reference 120; ATR 2
- Scenario 04 SVG — Reference 130; ATR 2.5
- Scenario 05 SVG — Reference 140; ATR 3
- Scenario 06 SVG — Reference 150; ATR 3.5
- Scenario 07 SVG — Reference 160; ATR 4
- Scenario 08 SVG — Reference 170; ATR 4.5
- Scenario 09 SVG — Reference 180; ATR 5
- Scenario 10 SVG — Reference 190; ATR 5.5
Common mistake: Treating a small normalized distance as proof of a successful retest omits the response and execution rule.
Research and evaluation
Observed win rate in a sample
Observed win rate is the number of positive outcomes divided by the counted trades. The result depends on the treatment of flat trades and is an estimate of a past sample.
Formula: Observed rate = wins / counted trades
Download all ten SVGs for this concept
- Scenario 01 SVG — 20 counted trades; flat outcomes excluded by this example
- Scenario 02 SVG — 30 counted trades; flat outcomes excluded by this example
- Scenario 03 SVG — 40 counted trades; flat outcomes excluded by this example
- Scenario 04 SVG — 50 counted trades; flat outcomes excluded by this example
- Scenario 05 SVG — 60 counted trades; flat outcomes excluded by this example
- Scenario 06 SVG — 70 counted trades; flat outcomes excluded by this example
- Scenario 07 SVG — 80 counted trades; flat outcomes excluded by this example
- Scenario 08 SVG — 90 counted trades; flat outcomes excluded by this example
- Scenario 09 SVG — 100 counted trades; flat outcomes excluded by this example
- Scenario 10 SVG — 110 counted trades; flat outcomes excluded by this example
Common mistake: Reporting win rate without payoff sizes can make a losing strategy look attractive.
Research and evaluation
Approximate win-rate standard error
Under an independent Bernoulli model, the plug-in standard error of an observed win fraction decreases with the square root of sample size. Dependence and regime shifts can invalidate this simple model.
Formula: SE = sqrt(p x (1-p) / n)
Download all ten SVGs for this concept
- Scenario 01 SVG — Observed win fraction 10%; independent-trial approximation
- Scenario 02 SVG — Observed win fraction 20%; independent-trial approximation
- Scenario 03 SVG — Observed win fraction 30%; independent-trial approximation
- Scenario 04 SVG — Observed win fraction 40%; independent-trial approximation
- Scenario 05 SVG — Observed win fraction 50%; independent-trial approximation
- Scenario 06 SVG — Observed win fraction 55%; independent-trial approximation
- Scenario 07 SVG — Observed win fraction 60%; independent-trial approximation
- Scenario 08 SVG — Observed win fraction 70%; independent-trial approximation
- Scenario 09 SVG — Observed win fraction 80%; independent-trial approximation
- Scenario 10 SVG — Observed win fraction 90%; independent-trial approximation
Common mistake: Using the normal approximation as an exact confidence guarantee, especially near zero or one, overstates precision.
Research and evaluation
Chronological research split
A chronological train-test split reserves later observations for evaluation after earlier observations are used to select a rule. Repeated tuning on the test segment removes its clean holdout role.
Formula: Training count = floor(total count x training fraction)
Download all ten SVGs for this concept
- Scenario 01 SVG — 100 chronologically ordered observations
- Scenario 02 SVG — 150 chronologically ordered observations
- Scenario 03 SVG — 200 chronologically ordered observations
- Scenario 04 SVG — 250 chronologically ordered observations
- Scenario 05 SVG — 300 chronologically ordered observations
- Scenario 06 SVG — 350 chronologically ordered observations
- Scenario 07 SVG — 400 chronologically ordered observations
- Scenario 08 SVG — 450 chronologically ordered observations
- Scenario 09 SVG — 500 chronologically ordered observations
- Scenario 10 SVG — 550 chronologically ordered observations
Common mistake: Shuffling time-dependent observations can leak information about future regimes into model selection.
Research and evaluation
Trade frequency per observation period
Trade frequency divides the number of completed trades by the observation duration. It provides activity context and does not by itself measure liquidity, capacity or profitability.
Formula: Frequency = completed trades / observation periods
Download all ten SVGs for this concept
- Scenario 01 SVG — Observation span 20 sessions
- Scenario 02 SVG — Observation span 25 sessions
- Scenario 03 SVG — Observation span 30 sessions
- Scenario 04 SVG — Observation span 35 sessions
- Scenario 05 SVG — Observation span 40 sessions
- Scenario 06 SVG — Observation span 45 sessions
- Scenario 07 SVG — Observation span 50 sessions
- Scenario 08 SVG — Observation span 55 sessions
- Scenario 09 SVG — Observation span 60 sessions
- Scenario 10 SVG — Observation span 65 sessions
Common mistake: Annualizing a short burst of trades without a stable activity assumption creates false precision.
Research and evaluation
Fraction of bars with exposure
Exposure time is the share of observed intervals during which a strategy holds a position under a specified sampling convention. It distinguishes active participation from time spent flat.
Formula: Exposure fraction = invested bars / eligible bars
Download all ten SVGs for this concept
- Scenario 01 SVG — 100 eligible bars; position-at-close convention
- Scenario 02 SVG — 150 eligible bars; position-at-close convention
- Scenario 03 SVG — 200 eligible bars; position-at-close convention
- Scenario 04 SVG — 250 eligible bars; position-at-close convention
- Scenario 05 SVG — 300 eligible bars; position-at-close convention
- Scenario 06 SVG — 350 eligible bars; position-at-close convention
- Scenario 07 SVG — 400 eligible bars; position-at-close convention
- Scenario 08 SVG — 450 eligible bars; position-at-close convention
- Scenario 09 SVG — 500 eligible bars; position-at-close convention
- Scenario 10 SVG — 550 eligible bars; position-at-close convention
Common mistake: Assuming bar-based exposure equals exact intrabar holding time hides the sampling approximation.
Research and evaluation
Annualizing a total return
Annualized growth converts a positive wealth ratio over a stated number of years into an equivalent constant yearly rate. It does not reproduce the path or the volatility of the investment.
Formula: Annualized growth = (ending / starting)^(1/years) - 1
Download all ten SVGs for this concept
- Scenario 01 SVG — Ending / starting wealth ratio 0.7; no cash flows
- Scenario 02 SVG — Ending / starting wealth ratio 0.8; no cash flows
- Scenario 03 SVG — Ending / starting wealth ratio 0.9; no cash flows
- Scenario 04 SVG — Ending / starting wealth ratio 1; no cash flows
- Scenario 05 SVG — Ending / starting wealth ratio 1.1; no cash flows
- Scenario 06 SVG — Ending / starting wealth ratio 1.2; no cash flows
- Scenario 07 SVG — Ending / starting wealth ratio 1.4; no cash flows
- Scenario 08 SVG — Ending / starting wealth ratio 1.6; no cash flows
- Scenario 09 SVG — Ending / starting wealth ratio 1.8; no cash flows
- Scenario 10 SVG — Ending / starting wealth ratio 2; no cash flows
Common mistake: Annualizing a brief exceptional result can imply a repeatable pace that the sample does not establish.
Research and evaluation
Square-root-of-time volatility scaling
Multiplying period return standard deviation by the square root of periods per year is a common scaling approximation. It relies on assumptions about serial dependence and variance stability.
Formula: Annualized SD = period SD x sqrt(periods per year)
Download all ten SVGs for this concept
- Scenario 01 SVG — Period return SD 0.25%; compare scaling frequencies
- Scenario 02 SVG — Period return SD 0.5%; compare scaling frequencies
- Scenario 03 SVG — Period return SD 0.75%; compare scaling frequencies
- Scenario 04 SVG — Period return SD 1%; compare scaling frequencies
- Scenario 05 SVG — Period return SD 1.25%; compare scaling frequencies
- Scenario 06 SVG — Period return SD 1.5%; compare scaling frequencies
- Scenario 07 SVG — Period return SD 1.75%; compare scaling frequencies
- Scenario 08 SVG — Period return SD 2%; compare scaling frequencies
- Scenario 09 SVG — Period return SD 2.25%; compare scaling frequencies
- Scenario 10 SVG — Period return SD 2.5%; compare scaling frequencies
Common mistake: Applying the square-root rule across dependent or changing-volatility returns can misstate risk.
Research and evaluation
Simplified periodic Sharpe ratio
A periodic Sharpe ratio divides mean periodic excess return by its standard deviation. A common annualization multiplies by the square root of periods per year under restrictive assumptions.
Formula: Annualized Sharpe = mean excess / SD x sqrt(periods per year)
Download all ten SVGs for this concept
- Scenario 01 SVG — Mean excess return 0.02%; period SD 1%
- Scenario 02 SVG — Mean excess return 0.03%; period SD 1%
- Scenario 03 SVG — Mean excess return 0.04%; period SD 1%
- Scenario 04 SVG — Mean excess return 0.05%; period SD 1%
- Scenario 05 SVG — Mean excess return 0.06%; period SD 1%
- Scenario 06 SVG — Mean excess return 0.07%; period SD 1%
- Scenario 07 SVG — Mean excess return 0.08%; period SD 1%
- Scenario 08 SVG — Mean excess return 0.09%; period SD 1%
- Scenario 09 SVG — Mean excess return 0.1%; period SD 1%
- Scenario 10 SVG — Mean excess return 0.11%; period SD 1%
Common mistake: Comparing ratios with different return frequencies or inconsistent risk-free conventions is misleading.
Research and evaluation
Maximum drawdown along an equity path
Maximum drawdown is the largest peak-to-later-trough decline in a specified equity path. Its value depends on sampling frequency and the inclusion of open-position mark-to-market changes.
Formula: Drawdown at t = equity(t) / running peak(t) - 1
Download all ten SVGs for this concept
- Scenario 01 SVG — Equity path includes a 5-unit decline from 115
- Scenario 02 SVG — Equity path includes a 7-unit decline from 115
- Scenario 03 SVG — Equity path includes a 9-unit decline from 115
- Scenario 04 SVG — Equity path includes a 11-unit decline from 115
- Scenario 05 SVG — Equity path includes a 13-unit decline from 115
- Scenario 06 SVG — Equity path includes a 15-unit decline from 115
- Scenario 07 SVG — Equity path includes a 17-unit decline from 115
- Scenario 08 SVG — Equity path includes a 19-unit decline from 115
- Scenario 09 SVG — Equity path includes a 21-unit decline from 115
- Scenario 10 SVG — Equity path includes a 23-unit decline from 115
Common mistake: Using the highest and lowest values without respecting their time order can invent an impossible drawdown.
Research and evaluation
Cost at which an assumed edge vanishes
The cost break-even threshold equals an assumed gross expected payoff when costs are expressed in the same per-trade units. Costs above that threshold turn the assumed net expectation negative.
Formula: Net EV = gross expected payoff - total expected cost
Download all ten SVGs for this concept
- Scenario 01 SVG — Assumed gross edge 2 per trade
- Scenario 02 SVG — Assumed gross edge 4 per trade
- Scenario 03 SVG — Assumed gross edge 6 per trade
- Scenario 04 SVG — Assumed gross edge 8 per trade
- Scenario 05 SVG — Assumed gross edge 10 per trade
- Scenario 06 SVG — Assumed gross edge 12 per trade
- Scenario 07 SVG — Assumed gross edge 14 per trade
- Scenario 08 SVG — Assumed gross edge 16 per trade
- Scenario 09 SVG — Assumed gross edge 18 per trade
- Scenario 10 SVG — Assumed gross edge 20 per trade
Common mistake: Interpreting a threshold based on estimated gross EV as a reliable future cost allowance ignores estimation risk.
