TradeViora AcademyLearn. Analyze. Practice. Trade Smarter.
Menu

FREE FINANCIAL EDUCATION

Futures risk scenarios

Distinguish terminal profit from the largest interim funding need.

0%

What you will learn

Prerequisites: Daily mark-to-market, cash collateral and initial versus maintenance requirements.

Mechanism and decision rules

A futures stress scenario should specify a path as well as an endpoint. The same final price can follow a smooth rise or a deep decline followed by recovery. Terminal P&L is identical for an unchanged position, but settlement losses and margin calls can differ materially along the way. An account unable to fund the adverse path may be liquidated before the profitable endpoint occurs.

Build separate columns for daily price P&L, cumulative P&L, required collateral and cash available for new payments. Settlement losses reduce account resources; an increase in required initial margin locks additional collateral. They are different uses of liquidity. Count each once. Cash previously deposited is not new cash merely because a report labels it margin, and unrealized gains in an unrelated asset may not be immediately transferable.

A useful scenario also states whether prices can gap, whether the market remains open, whether collateral prices fall and whether transfer cut-offs are met. Define an escalation level and a feasible reduction process before relying on a last-minute top-up. A scenario is an assumed event sequence, not a probability forecast or a bound on possible loss.

Worked example · synthetic data

Two fictional long futures are entered at 1,000 with ₹50 per point per contract. Daily settlements are 950, 920 and 1,010. Cash P&L is −₹5,000, −₹3,000 and +₹9,000. The final gain is ₹1,000, yet the largest cumulative settlement deficit is ₹8,000 after the second day.

Suppose the required collateral also increases from ₹10,000 already posted to ₹15,000 at that time. The extra collateral need is ₹5,000. Beyond the originally posted amount, the assumed path needs ₹13,000: ₹8,000 settlement funding plus ₹5,000 incremental collateral. A reserve of ₹12,000 is short by ₹1,000 even though the eventual trade is profitable.

Failure modes and limits

Real requirements can change intraday, offsets can disappear and settlement credits may arrive after payment deadlines. The example treats the stated margin increase as additional to the loss funding and assumes all initial collateral remains eligible. Do not add the full new margin requirement again if the old amount is already posted. Stress exits should include realistic executable prices, not guaranteed stop fills.

Practice case

Three long contracts have ₹20 per point exposure. Price moves from 500 to 470 before recovering to 510. Required collateral rises from ₹6,000 already posted to ₹9,000 at the trough. What additional liquidity does this assumed path need, and what is terminal P&L?

Reveal the worked answer

The trough settlement deficit is 30×20×3 = ₹1,800. Additional collateral is ₹3,000, so the path needs ₹4,800 beyond the existing deposit. Terminal P&L is (510−500)×20×3 = +₹600 before charges. These separate answers show why a terminal-profit estimate cannot substitute for a funding plan.

Check your understanding

A profitable final endpoint guarantees what about interim margin calls?


Explanation

Daily settlement makes the path relevant even when final P&L is positive.

Required collateral rises from 10,000 already posted to 15,000. What is the incremental amount?


Explanation

Subtract the existing posted amount rather than counting it twice.

Two contracts at ₹50 per point lose 80 points before recovery. What is the trough price loss?


Explanation

The aggregate point exposure is ₹100, multiplied by an 80-point adverse move.

Sources and next steps

The lesson, calculations and synthetic cases are original educational material. References explain underlying contract or chart conventions; none validates the profitability of a trading rule. Actual contract specifications, settlement obligations and charges must be checked before trading.

Explore OHLCV data in the chart lab · Explore volume-at-price and TPO data · Practice library